Manufacturer Part Number | RNCC | RNVC | Manufacturer Name | CAGE | |
---|---|---|---|---|---|
PPL863 | 3 - Design Control Reference | 2 - Production Item | US ARMY COMMUNICATIONS & | 80063 | ![]() |
TK100G | 5 - Replaced / Discontinued | 2 - Production Item | JOINT ELECTRONICS TYPE DESIGNATION | 80058 | ![]() |
Design Control Reference. The primary number used to identify an item of production or a range of items of production, by the manufacturer (individual, company, firm, corporation, or Government activity) which controls the design, characteristics, and production of the item by means of its engineering drawings, specifications and inspection requirements.
Secondary Reference. Any additional number, other than a primary number (codes 1,2,3,4) informative reference (code 6) or vendor item drawing reference (code 7) assigned to an item of production or supply by a commercial or Government organization, which represents the same item of production or supply to which the National Stock Number (NSN) was assigned. The reference number may have had an RNCC of 1, 2, 3, 4 or 7 but has since been replaced in the item-of-supply concept of the NSN by another primary number.
A design control or other reference number that is an item-identifying number for an item of production, or a source control reference or a specification or standard part, type, or similar reference number that is an item-identifying number for an item of supply.
FSG | FSC | NIIN | FIIG | INC | CRITICALITY | TYPE OF ITEM | MRC | DEMIL | HMIC | EDC | PMIC | ADPEC | DATE CREATED |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
51 | 5180 | 006050079 | 77777 | 2 | 9 | A | N | A | A | 0 | 1 Jan 1963 |
Reference Item Identification
A Defense Logistics Information Service-generated code for items lacking but requiring an RPDMRC (i.e., through mass FIIG revision change an item may be downgraded from a type 1 to a reference or partial descriptive method item identification).
Non-MLI/ Non-SLI — Demilitarization not required.
Indicates there is no data in the HMIRS and the NSN is in a FSC not generally suspected of containing hazardous materials.
No known Electrostatic Discharge (ESD) or Electromagnetic Interference (EMI) sensitivity.
Item does not contain Precious Metal.
Represents items with no ADP components. NOTE: Codes 1 through 6 are only to be used when the item is Automatic Data Processing Equipment (ADPE) in its entirety and is limited to the type meeting only one of the definitions for codes 1 through 6. (See code 9)
MOE Rule | Former MOE | AMC | AMSC | NIMSC | IMC | IMC Activity | AAC | DSOR | Collaborators | Receivers | Effective Date | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A502 | 1 | G | A | D | CL | TB | AZ | CT | BF | BD | 1 Apr 1991 | |||||||||||||||||||
F5CL | 1 | G | 1 | E | TG | AD | 1 Apr 1991 | |||||||||||||||||||||||
NSLL | 1 | G | 5 | E | HD | TB | GG | 1 Apr 1991 | ||||||||||||||||||||||
YB01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
YJ01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZA01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZE01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZP01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZT01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZU01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZG01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZH01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
YA01 | 1 Sep 2000 | |||||||||||||||||||||||||||||
WB01 | 1 Feb 2005 | |||||||||||||||||||||||||||||
ZW01 | 1 Nov 2005 | |||||||||||||||||||||||||||||
ZX01 | 1 Oct 2007 | |||||||||||||||||||||||||||||
ZM01 | 1 Feb 2015 | |||||||||||||||||||||||||||||
ZF01 | 1 Jun 2015 |
Suitable for competitive acquisition. Potential sources shall include dealers/distributors. If sources are limited to the prime contractor and a subcontractor, a competitive code shall not be assigned unless both sources are expected to compete independently for contracts for the part.
The Government has unlimited rights to the technical data, and the data package is complete. Valid AMCs: 1 and 2.
An activitiy within the Army is providing depot maintenance support.
Major End Items of Equipment: Items of such importance to the operations readiness of operating units that they are subject to continuing centralized individual item management and asset control throughout all command and support echelons.
U.S. Army Communications-Electronics, Fort Monmouth, NJ 07703-5006
Exception Item (End Item of Equipment). This code identifies SICA managed end items of equipment assigned to another service PICA that is responsible for the wholesale logistics support functions of single submitter of cataloging data, acquisition and disposal authority. Supply support requirements will be submitted by the SICA to the PICA on Military Interdepartmental Purchase Requests (MIPRs) unless otherwise directed by the PICA. The SICA is responsible for the wholesale stock, store, and issue functions in support of SICA activities and has retained depot repair capability where applicable. Retention of depot maintenance capability for end items of equipment requires documented justification by the SICA to the PICA via JLC Form 19. If PICA and SICA cannot reach an agreement the documentation will be forwarded to the joint MISMOs for a decision. The SICA Catalog Management Data (CMD) will reflect Source of Supply or SOS Modifiers compatible with the SICA managing activity. The PICA will not be entered in the Defense Automatic Addressing System Integrated Materiel Manager (DAAS IMM) field.
Reparables: Centrally managed recoverable items designated as reparable for the reasons that repair of unserviceable quantities of the items are considered by the inventory manager in satisfying requirements prior to or in conjunction with determining procurement quantities.
Warner-Robins Air Logistics Center, Robins AFB, GA 31098-5609
Depot Reparable Component (Type II). This code identifies SICA managed depot reparable components assigned to another service which is responsible for the logistics functions of single submitter cataloger, acquisition and disposal authority, depot maintenance, and performs the wholesale stock, store, and issue functions and establishes, budgets, and funds the wholesale stock level requirement. Supply requirements will be submitted to the PICA on requisitions which are funded by a designated point within the SICA. Unserviceable SICA assets will normally be returned to the PICA for credit. The SICA will provide item/program data required by the PICA to meet the materiel support commitments. Normally, Military Interdepartmental Purchase Requests (MIPR) will not be requested by the PICA to support SICA NIMSC 5 requirements. The SICA CMD will reflect Source of Supply or SOS Modifiers compatible with the SICA managing activity. The PICA will not be entered in the DAAS IMM field.
Naval Inventory Control Point, Mechanicsburg, PA 17055-0788
Tobyhanna Army Depot (TYAD), PA
U.S. Army Tank-Automotive and Armaments, Command, Warren, MI 48397-5000
U.S. Army Aviation and Missile Command (AIR) Redstone Arsenal, AL 35898-5230
U.S. Army Armament and Chemical Acquisition and, Logistics Activity, Rock Island, IL 61299-6000
U.S. Army Aviation and Missile Command, Redstone Arsenal, AL 35898-5230
Naval Inventory Control Point, Philadelphia, PA 19111û5098
ISC | Originator | NIIN Status | Replaced / Replacement ISC | Replaced / Replacement Originator | Replacement NIIN Status | Replacement Date | Replaced / Replacement NSN | Decision Date |
---|---|---|---|---|---|---|---|---|
6 | D2 | 0 | 8 Oct 1965 |
An item authorized for procurement that is in a specific Federal Supply Class (FSC) or item name grouping consisting primarily of items which are one-of-a-kind; therefore, little or no potential exists for elimination of items through formal item reduction studies.
Natick Research, Development and Engineering, Center, Natick, MA 01760-5014
Item is active. File data coded KFD is forwarded. if this KFD data represents your item of supply, submit, if applicable, an LAD, LAU, or LCU transaction. Otherwise, use the National Stock Number (NSN) in your supply system.
Integrity | Originating | HMC | LCL | WCC | TCC | SHC | ADC | ACC | ASH | LTL | NMFC | NMFC Sub Item | UFC | Freight Description | Rail Variance |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
FL | Q | 732 | Z | 9 | A | B | Z | W | 186620 | Z | 91810 | TOOLS--NOI-HAND-OTHER-THAN-POWER |
Fuel, aviation, turbine engine, Flammable liquid.
70
Tools, Hand and Portable, Electric
No special type of cargo code applicable
No special handling required
Shipment is not a consolidation and does not exceed 72 inches in any dimension.
Construction materials: Includes paint and related materials, prefabricated building, wood products, metal and composition materials and their products, commercial hardware and miscellaneous items, cement, asphalt, building maintenance materials.
No special handling required.
Variable Rating
No Variation. NMFC and UFCC Match.
US Army Communications-Electronics, Command and Fort Monmout, Fort Monmouth, NJ 07703-5016
SERVICE/AGENCY-MANAGED (Service/Agency use only.) Issue, transfer, or shipment is not subject to specialized controls other than those imposed by individual Services supply policy. 1. The item is centrally managed, stocked, and issued. 2. Requisitions will be submitted in accordance with Service requisitioning procedures.
Handtools and shop equipment
1
ARMY: Item requires special handling or condemnation procedures for specific reasons, such as precious metal content, high dollar value, critical material, or hazardous materiel. Refer to appropriate manuals or directives for specific instructions. MARINE CORPS: Item requires special handling/or condemnation procedures because of specific reasons (i.e., precious metal content, high dollar value, critical material, or hazardous material). Refer to appropriate manuals/directives for specific instructions. NAVY: Field Activity Control Items
Each - A numeric quantity of one item of supply. Do not use if a more specific term applies, such as kit, set, assortment, assembly, group, sheet, plate, strip or length.
TYPE I or TYPE II (Non-Deteriorative/No Shelf-Life) - An individual item of supply which is determined through an evaluation of technical test data and/or actual experience to be an item with a definite non-extendible period of shelf-life OR An individual item of supply having an assigned shelf-life time period that may be extended after completion of inspection/test/restorative action.
Warner Robins Air Logistics Center, 455 Byron St, Robins AFB, GA 31098-1860
AIR FORCE ERRC NF2: AF Equipment Management System (AFEMS); NAVY: Fast moving centrally managed 1I COG forms (locally procured at selected designated overseas activities)
NAVICP-ERP, 700 Robbins Avenue, Philadelphia, PA 19111-5098
ARMY: If condemned or uneconomically repairable, then dispose at intermediate level; COAST GUARD: Reparable item. Repair, condemnation, and disposal not authorized below intermediate (district) level; MARINE CORPS: Reparable item. When uneconomically reparable, condemn and dispose at fourth echelon level; NAVY: Depot Level Reparable
Department of the Army
Department of the Air Force
Department of the Navy
Source | PICA / SICA | Packaging Category | Storage | Preservation | Clean/Dry | INT Qty | Unit Weight | Unit Size | Unit Pack Cube | Item Weight | Item Dims |
---|---|---|---|---|---|---|---|---|---|---|---|
A | P | A | ZZ | Z | 130.0 lbs | 30.8in x 21.2in x 22.8in | 8,616.000 cu ft |
Preservation Material | Wrapping Material | Cushioning / Dunnage | Cushioning Thickness | Unit Container | Intermediate Container | Unit Container Level | Special Marking | Level A Packing | Level B Packing | Minimal Packing | Optional Procedure |
---|---|---|---|---|---|---|---|---|---|---|---|
ZZ | ZZ | ZZ | Z | ZZ |
Packaging Data Record contains data that does not meet current MIL-STD-2073-1C/D formats
Primary Inventory Control Activity (PICA)
Heated General Purpose – Heated 40 F and above
See J.4.1.b
Special Requirements - See specific instructions or drawings provided.
Special requirement – See specific instructions or drawings provided
Special requirements – see specific instructions or drawings provided
Special requirements. See specific instructions or drawings provided.
Special requirements-See specific instructions or drawings provided
Special requirement – See specific instructions or drawings provided.