Manufacturer Part Number | RNCC | RNVC | Manufacturer Name | CAGE | |
---|---|---|---|---|---|
8010M-01 | 3 - Design Control Reference | 2 - Production Item | FLUKE CORPORATION | 89536 |
Design Control Reference. The primary number used to identify an item of production or a range of items of production, by the manufacturer (individual, company, firm, corporation, or Government activity) which controls the design, characteristics, and production of the item by means of its engineering drawings, specifications and inspection requirements.
A design control or other reference number that is an item-identifying number for an item of production, or a source control reference or a specification or standard part, type, or similar reference number that is an item-identifying number for an item of supply.
FSG | FSC | NIIN | FIIG | INC | CRITICALITY | TYPE OF ITEM | MRC | DEMIL | HMIC | EDC | PMIC | ADPEC | DATE CREATED |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
66 | 6625 | 011216977 | A310A0 | 00794 | X | 4 | 3 | A | P | A | A | 0 | 7 Nov 1981 |
Electrical and Electronic Properties Measuring and Testing Instruments
The item does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application.
Partial Descriptive Item Identification (Type 1 Concept)
An approved item name and FIIG exist but the item involved is so unique in design that it cannot be fully described in accordance with the FIIG.
Non-MLI/ Non-SLI — Demilitarization not required.
Indicates there is no information in the HMIRS; however, the NSN is in a FSC in Table II of Federal Standard 313 and a MSDS may be required by the user. The requirement for a MSDS is dependent on a hazard determination of the supplier or the intended end use of the product.
No known Electrostatic Discharge (ESD) or Electromagnetic Interference (EMI) sensitivity.
Item does not contain Precious Metal.
Represents items with no ADP components. NOTE: Codes 1 through 6 are only to be used when the item is Automatic Data Processing Equipment (ADPE) in its entirety and is limited to the type meeting only one of the definitions for codes 1 through 6. (See code 9)
MOE Rule | Former MOE | AMC | AMSC | NIMSC | IMC | IMC Activity | AAC | DSOR | Collaborators | Receivers | Effective Date | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
YB01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
YJ01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
YW01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
ZH01 | 1 Apr 1991 | |||||||||||||||||||||||||||||
FGG4 | FEE4 | 3 | C | X | D | 99 | 1 Sep 2000 | |||||||||||||||||||||||
NSGS | NSES | 3 | C | 1 | D | JA | GG | 1 Sep 2000 | ||||||||||||||||||||||
WB01 | 1 Feb 2005 | |||||||||||||||||||||||||||||
ZU01 | 1 May 2008 | |||||||||||||||||||||||||||||
WP01 | 1 Jun 2011 | |||||||||||||||||||||||||||||
YA01 | 1 May 2012 | |||||||||||||||||||||||||||||
ZX01 | 1 Jan 2014 | |||||||||||||||||||||||||||||
ZM01 | 1 Feb 2015 |
Acquire directly from the actual manufacturer, whether or not the prime contractor is the actual manufacturer.
This part requires engineering source approval by the design control activity in order to maintain the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. Valid AMCs: 1, 2, 3, 4 and 5.
All other conditions.
Major End Items of Equipment: Items of such importance to the operations readiness of operating units that they are subject to continuing centralized individual item management and asset control throughout all command and support echelons.
Exception Item (End Item of Equipment). This code identifies SICA managed end items of equipment assigned to another service PICA that is responsible for the wholesale logistics support functions of single submitter of cataloging data, acquisition and disposal authority. Supply support requirements will be submitted by the SICA to the PICA on Military Interdepartmental Purchase Requests (MIPRs) unless otherwise directed by the PICA. The SICA is responsible for the wholesale stock, store, and issue functions in support of SICA activities and has retained depot repair capability where applicable. Retention of depot maintenance capability for end items of equipment requires documented justification by the SICA to the PICA via JLC Form 19. If PICA and SICA cannot reach an agreement the documentation will be forwarded to the joint MISMOs for a decision. The SICA Catalog Management Data (CMD) will reflect Source of Supply or SOS Modifiers compatible with the SICA managing activity. The PICA will not be entered in the Defense Automatic Addressing System Integrated Materiel Manager (DAAS IMM) field.
Depot source of repair has not been assigned. This is a temporary code that will be used only until a DSOR is assigned as specified in joint Service regulation AMC-R 750û10, OPNAVINST 4790.14A AFI 21û133(I), MCO P4790.10B, DLAD 4151.16, Joint Depot Maintenance Program, 31 March 1999.
Fleet Readiness Center South East (FRC-SE), Jacksonville FL
Naval Inventory Control Point, Philadelphia, PA 19111û5098
ISC | Originator | NIIN Status | Replaced / Replacement ISC | Replaced / Replacement Originator | Replacement NIIN Status | Replacement Date | Replaced / Replacement NSN | Decision Date |
---|---|---|---|---|---|---|---|---|
2 | TX | 0 | 9 Aug 1983 |
An item authorized for procurement which has been included in an item reduction study and which initially does not replace an item not authorized for procurement. In addition, in generic relationships, a code 2 item is related to a code 1 item.
Defense Supply Center Columbus, Columbus, OH 43218
Item is active. File data coded KFD is forwarded. if this KFD data represents your item of supply, submit, if applicable, an LAD, LAU, or LCU transaction. Otherwise, use the National Stock Number (NSN) in your supply system.
Integrity | Originating | HMC | LCL | WCC | TCC | SHC | ADC | ACC | ASH | LTL | NMFC | NMFC Sub Item | UFC | Freight Description | Rail Variance |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SE | P | 72E | Z | 9 | A | H | Z | A | 061700 | A | 34580 | ELEC-APPLIANCES-INSTRUMENTS-NOI |
San Antonio Air Logistics Center, Kelly AFB, TX 78241-5000
77.5
Engineer and Material Handling Equipment, Test/Tool sets and Equipment
No special type of cargo code applicable
No special handling required
Shipment is not a consolidation and does not exceed 72 inches in any dimension.
Signal Corps supplies and equipment, including radio equipment and supplies, communications equipment and supplies, electrical equipment and supplies, etc.
No special handling required.
400
No Variation. NMFC and UFCC Match.
Warner Robins Air Logistics Center, 455 Byron St, Robins AFB, GA 31098-1860
TERMINAL ITEM. Identifies items in stock, but future procurement is not authorized. Requisitions may continue to be submitted until stocks are exhausted. Preferred item National Stock Number is normally provided by application of the phrase: When Exhausted Use (NSN). Requisitions will be submitted in accordance with IMM/Service requisitioning procedures as applicable.
Unclassified
1
AIR FORCE ERRC NF2: AF Equipment Management System (AFEMS); NAVY: Fast moving centrally managed 1I COG forms (locally procured at selected designated overseas activities)
Each - A numeric quantity of one item of supply. Do not use if a more specific term applies, such as kit, set, assortment, assembly, group, sheet, plate, strip or length.
TYPE I or TYPE II (Non-Deteriorative/No Shelf-Life) - An individual item of supply which is determined through an evaluation of technical test data and/or actual experience to be an item with a definite non-extendible period of shelf-life OR An individual item of supply having an assigned shelf-life time period that may be extended after completion of inspection/test/restorative action.
NAVICP-ERP, 700 Robbins Avenue, Philadelphia, PA 19111-5098
SERVICE/AGENCY-MANAGED (Service/Agency use only.) Issue, transfer, or shipment is not subject to specialized controls other than those imposed by individual Services supply policy. 1. The item is centrally managed, stocked, and issued. 2. Requisitions will be submitted in accordance with Service requisitioning procedures.
ARMY: When repair is beyond lower level maintenance capability, evacuate the item to depot. Disposal is not authorized below wholesale level; MARINE CORPS: Reparable item. When beyond lower level repair capability, return to depot. Condemnation and disposal not authorized below depot level; NAVY: Field Level Reparables
NOT STOCKED, CENTRALLY PROCURED # (NON-STOCKED ITEMS) IMM/Service centrally managed but not stocked item. Procurement will be initiated only after receipt of a requisition.
ARMY: If condemned or uneconomically repairable, then dispose at intermediate level; COAST GUARD: Reparable item. Repair, condemnation, and disposal not authorized below intermediate (district) level; MARINE CORPS: Reparable item. When uneconomically reparable, condemn and dispose at fourth echelon level; NAVY: Depot Level Reparable
Department of the Air Force
Department of the Navy
Source | PICA / SICA | Packaging Category | Storage | Preservation | Clean/Dry | INT Qty | Unit Weight | Unit Size | Unit Pack Cube | Item Weight | Item Dims |
---|---|---|---|---|---|---|---|---|---|---|---|
A | S | A | 51 | 1 | 000 | 3.0 lbs | 1.000 cu ft |
Preservation Material | Wrapping Material | Cushioning / Dunnage | Cushioning Thickness | Unit Container | Intermediate Container | Unit Container Level | Special Marking | Level A Packing | Level B Packing | Minimal Packing | Optional Procedure |
---|---|---|---|---|---|---|---|---|---|---|---|
00 | 00 | NA | X | ED | 00 | O | 03 | E | Q | M |
Source | PICA / SICA | Packaging Category | Storage | Preservation | Clean/Dry | INT Qty | Unit Weight | Unit Size | Unit Pack Cube | Item Weight | Item Dims |
---|---|---|---|---|---|---|---|---|---|---|---|
P | P | 51 | 1 | 000 | 8.5 lbs | 14in x 13in x 5in | 0.526 cu ft | 4.1 lbs | 11.8in x 2.4in x 9.6in |
Preservation Material | Wrapping Material | Cushioning / Dunnage | Cushioning Thickness | Unit Container | Intermediate Container | Unit Container Level | Special Marking | Level A Packing | Level B Packing | Minimal Packing | Optional Procedure |
---|---|---|---|---|---|---|---|---|---|---|---|
00 | JA | NA | X | ED | 00 | B | O |
Packaging Data Record contains data that does not meet current MIL-STD-2073-1C/D formats
Secondary Inventory Control Activity (SICA)
Heated General Purpose – Heated 40 F and above
Watervaporproof bag, sealed
Any suitable process that is not injurious to the item.
Primary Inventory Control Activity (PICA)
Primary Inventory Control Activity (PICA)
No requirement
No requirement
PPP-C-795, cellular plastic film cushioning; or A-A-3129, open cell plastic cushioning; or PPP-C-1797, polypropylene foam cushioning; or A-A-59136, polyethylene foam cushioning
As required to protect the item or elements of the package
ASTM-D5118, Type CF, Class weather resistant, corrugated fiberboard box.
No requirement.
Unit container is not an acceptable shipping container.
Mehod 50
Packing shall be accomplished to meet the performance test requirements of ASTMD4169, Distribution Cycle 18, Assurance Level 1.
Packing shall be accomplished in accordance with table C-II for the packing level specified. Closure sealing and reinforcement shall be in accordance with the appropriate shipping container specification.
All packaging data is mandatory for compliance and no substitutions are permitted. Fast packs should be included in this category.
No requirement
A-A-3174, plastic sheet, polyolefin, 2 mil
PPP-C-795, cellular plastic film cushioning; or A-A-3129, open cell plastic cushioning; or PPP-C-1797, polypropylene foam cushioning; or A-A-59136, polyethylene foam cushioning
As required to protect the item or elements of the package
ASTM-D5118, Type CF, Class weather resistant, corrugated fiberboard box.
No requirement.
Unit container provides level B packing protection.
Options can be exercised as to specific method of preservation or DoD approved packaging materials to be used. However, basic preservation method shall be retained, supplemental data shall be complied with, and unit package dimensions shall not be increased by more than one inch. Equal or better protection shall be given the item and there shall be no increase in the package cost.
MRC | Decoded Requirement | Clear Text Reply |
---|---|---|
CBBL | Features Provided | PORTABLE |
ACZB | Frequency Rating | 50.000 HERTZ MINIMUM AND 60.000 HERTZ MAXIMUM |
CTWN | Operating Voltage Rating In Volts | 90.0 DC MINIMUM AND 264.0 DC MAXIMUM |
AWZJ | Power Source | EXTERNAL |
FEAT | Special Features | 3.500 DIGIT LIQUID CRYSTAL; MILITARIZED VERSION OF THE 8010A-01,MEETS EMI SPECS |
ABKW | Overall Height | 2.500 INCHES NOMINAL |
ABHP | Overall Length | 10.000 INCHES NOMINAL |
ABMK | Overall Width | 8.500 INCHES NOMINAL |
STYL | Style Designator | RECTANGULAR SURFACE MTG |