MWO-9-2330-390-25-1

MODIFICATION WORK ORDER

MODIFICATION OF M1022A1 DOLLY SET; POSITIONING TUBE REINFORCEMENT

DECEMBER 2006
CHANGE 1

  MWO-9-2330-390-25-1 - Page 10 of 54

MWO 9-2330-390-25-1
8
c.
Government Verification. All QA operations, installation changes, and
inspections performed by the installer are subject to Government verification at
unannounced and varying intervals. Verification will consist of observations and
inspections to confirm that practices, methods, and procedures of the installer’s
written inspection plan are being properly applied; and that Government product
inspection to confirm the quality of product offered for Government acceptance
does not deviate from prescribed acceptance standards specified in TM 9-2330-
390-14&P.
Deviations will be brought to the attention of the installer for
correction.
d.
In-process Inspection. During normal assembly operations, paragraph 10,
Modification Procedure, will be used to check the installer’s work.
After
installation is complete, the installer will correct any defects noted before the
Dolly is placed in service. All Dollies modified during a production shift will be
checked to ensure product quality.
14.
RECORDING AND REPORTING OF THE MODIFICATION.
a.
Records and Reports. The organization responsible for MWO application will
report application information as follows:
(1)
Reporting will be accomplished by electronic means. MWO application
information can be input directly into the Modification Management
Information System (MMIS) over the Internet. If Internet is not available,
recording will be on a 3.5-inch disk, which will be mailed to the MMIS
administrator. Entry into the MMIS system is password protected. New
users can register on-line at
. Passwords are
normally approved and issued within 48 hours.
(2)
Submission will be comprised of nine (9) data elements listed in the table
below. Elements 1,2,4,6,7,8 & 9 are given for this MWO (as shown). The
person reporting the MWO data, will acquire the remaining elements (3 &
5), and input all nine into MMIS.
DATA Elements
Input Data
1.
Material Change Number (MCN)
2.
MWO Number
3.
Unit Identification Code (UIC) @ Battalion Level
4.
NSN of End Item
5.
Serial Number
6.
USA Registration Number
7.
Date of Application
8.
Hours required for Application.
9.
Software Version


Back to Top