TM-9-2350-261-PMC

CARRIER, M113A2, M577A2, M106A2, M125A2 AND M1059

CREW DAILY PMCS FOR OPERATOR’S MANUAL

  TM-9-2350-261-PMC - Page 2 of 11

1.
* 2.
*3.
*4.
* 5.
NOTE
While performing PMCS:
Check all bolts. nuts, and screws for
Iooseness breaks or missing.
Check for broken welds
Check electrical connections for cracked or
broken wire, or loose connectors
Check hoses and fluid lines for wear,
damage, and leaks.
For any special operation refer to TM
9-2350-261-10.
When working in/around the carrier, follow all
safety procedures.
Checkmark each item where any fault is noted.
Record all faults on DA Form 2404.
Provide equipment readiness status to your
immediate leader.
Refer to TM 9-2350-261-10 for Weekly and
Monthly PMCS.
BEFORE OPERATION CHECKS
CARRIER COMMANDER
Check exterior above shroud for damaged or missing items. Ensure
all items are properly secured.
Check fixed fire extinguisher handle and seal.
Check smoke grenade launcher (M113A2, M1059).
Check for leaks, loose hull access and drain plugs.
CAUTIO N
Check all flexible air intake ducts. Do not operate
carrier if damage exists.
Check inside front power plant compartment for leaks and damage.
a. Air intake duct (holes or tears)
b. Fuel lines (leaks)
c. Coolant hoses (leaks)
d. Oil lines (leaks)
2 of 8


Back to Top