PS Magazine - FEBRUARY 1974

PS, The Preventative Maintenance Monthly

ISSUE 255

FEBRUARY 1974

PS Magazine - FEBRUARY 1974 - Page 31 of 35
·
KEEPING TRACK OF YOUR .
..
+Nor
OPERAti±NALLY
READY-
MAiNtENANCE
Equipment nonavailable TIme and NORS-NORM TI±e are ²ne and The same³
If you'´e TaLkIng about totals.
BuT yoU can'T reporT NORµ¶NO·¸ tI±e as a lU±P sU±. You divide iT InTo 4
ParTs ( NORµ O´ganIzaTional and NO·µ µUPPorT, NORM OrganIzational and NO·M
SUPPort) on DA Fo¹ 2406, cols i and
j.
ºhat's so aLL leveLs of command can teLL aT whIch ±a»nTenance level The equIp¼
±ent Is N²T OPerationaLly ·eady½µ¾ppl¿(NORS) and NoÀ ÁPeraTIonally ReadyÂ
MaInTenance (NO·M) when checkIng The TI±e It's
nonavailable.
ÃLL eqUIPment ´eP²rTabLe on DA 2406 reqUIres a NORS¶NORM TIme breakdownÄ
ÃpPendix
C ²f ºM 38¶750 Is your repo´Table LisT fo´ DA 2406.
All THAT FIt THIS
ECC ANd GENERIC
NOmENClATU²E ARE
REPORtABlE³WHETHER
lISTEd O´ nOTµ
For ECC's B and C (gUIded mIssile and aIr defense sysTe±s) and JB ( co±mUni¼
caTion and elecT´onics) you ´eport "all corresPondIng ±akes aÅd ±odelsÆ on DA 2406.
Ç
Èay cl²se aTtenTion To para CÉ2b, APPendIx C of The ºMÄ
58
STACK ¶T UP
µInÊe NORµ¶NO·M TI±e Is rePorTed ²n DA 2406 by LIne nu±be´ (ECC pluË
ÌÍN)ÎnoT by indiviÏual equipment itemÐyoU need a way T² accumulate the inf² at
ÑoTh O´ganizationaÒ and µuppo´t levels.
At O´ganizaTional le el, This accumulaTIoÓ for The NORµ¶NORM colUmns is made
ÏI´ect on the DD Fo´m 314 Ô²´ eaÕh item.
YoU enter
0
in ThÖ box under the day ²f The ±onTh× º² rec²rd a half day divide the
±
symbol. ºo sepa´ate NORµ TIme f´oØ NORM TI±e, pUt an s insIde The
±
fo´ The day
(or haLf day) That maintenance was delayed becaUse a repair ParT or co±ponenT was
noT available.
N² NO·µ¶NO·¸ Time Is recorÏed Ôo´ The Ùrst haLf day ( 1¶Ú2 houÛs) that the
iTem is in OrganIzational maintenance. ºime ove´ 12 buT LeËs Than 24 hou´s is counteÏ
as a half dayÄ ºÜme in Organizational maIntenance that faLls in 2 consecutive daysÝ
·
even iÔ under 12 hours eaÊh Ïay (sucH as Þrom 1ß00 ²ne day t² à8á The next)Ý Is
counTed as a halÔ day. AfTe´ the ÙrsT day, each fâll ( 24ãhr) day coUnts as 1 day.
Full dayË In O´ganizational ±aIntenance are c²unted aË NO·µ
or
NO·¸, dePend¼
Ing on wheTher suPply o´ mainTenance acTIons reqUIred mosT ²f The TIme. (ºhe Ëame
applies To a half day on a date when ²nly a haLä day is reco´ded.)
A Ïay on whIch boTh O´ganizati²naå and µupP²rt ±ainTenance are pe´fo´med Is
recorded aæ Supp²rT timeÐeiThe´ NQ·µ o´ NOR¸.
çven ThoUgh you ente´ half days Ôo´ IndivIdUal equipment items on DD 314,
you don'tèente´ halÔ days on DA 24à6. First adé all The NO·µ anÏ NO·¸ TÜme ( 4 sepÂ
araTe colu±ns) for a parTicula´ DA 2406 LIneÐThen round each column toTal up to the
next whole nUmber.
ENTER tOtAl NORS/NORM
·iME hERE fOR ALl
itEMS ±N thIS
PaRTIculaR lINE¸ USE
WhOLE ¹uMBERs ONLY
º
FêrInËTance, DD 314's for iTems on a ParTIcula´ DA
migHt Ëhow Or¶
ganIzaTI²nal NORµ TImes of 1
+
2
+ 1 +
2 whIch equals 5%. But it would be en¼
te´ed
on
2406 as 6 days NO·µ
(O´ganizational)ì
Do The same Ôor íe
O´ganizaTional NO·M Êolumn.
59


Back to Top
Back to Top