M51 CB Shelter .±²
Dab some GAA grease on the sup-
port rack (pallet) skids. That lets you
remove and replace the rack wIthout
muscLe straIN.
KeEp fet and hands oF the hInged
suppor± ²ames where you store the arch
support (rIbs). ³rames are not steps or
han´hoLds. That kIn´ oµ use caN break
theIr weLds. You can also break the
clamps WhIch hoL´ the ¶ames In pLace.
Store the ·oted rIbs wIth the fet
,±
,
palLet. That way, alL oµ the rIbs wILL
f
on the palLet.
¸oad
and
unLoad
the
entrance
assembLy on the paLlet In one PIece. Use
a 6¹ or 8¹man carry. ºt's easIer. ³ewer
people meaNs somebody can get hurt.
»Ith ·ur peopLe you have to carry the
entrance and paLlet separately.
56
NOV 85
operatin
g
·
Tips
A
¸ock the throttle (turn It cLockwIse)
a¼er you adj½st It to 58¹62 cycles oN the
G¾¿¾RATOR ³R¾QÀÁÂCY MR.
ºµ you don't lock It, the throttle wIll slIp
durIng
operatIon.
That
Increases
generator cycLes whIch caN damage
equIPment Powered by the generator.
See Ãara 2¹4, TÄ 3Å4240¹264¹12.
A
Don't sweat It Iµ the shelter Æoor
rIses severaL Inches when you take the
top oF the heater and aIr condItIoner
paneLs. The Æoor wIlL go down when
you put the tops back oN and Pressure
buIlds up.
A
ºµ the ÄASK LIght on the sheLter
auxIlIary control comes on a¼er 5¹8
mInutes operatIon, readjust the INterIor
aIr pressure lIke Çara 2¹54 oµ your TÄ
says, usIng your aIr Æow gage.
mask
NOV 85
A
ºµ you get no readINg on the maIn
control paNel amp meter, check the Èse
on the rheostat In the engIne compar±É
ment. Àse TÄ 5Å28Ê5¹259¹Ë4.
Shutd±wn and St±rage
R
ºt takes 2 mInutes to burn oF exÌ
cess Èel a¼er you shut down the heater.
»aIt the 2 minutes be·re you shut
system power down.
A
»hen you deÆate the shelter and
when you run the evacuator Ín, keep
ÎourÏ power supply engIne runnIng.
OtherwIse, youÐll run the bat±ery down.
A
AÑer you dIsmaNtle the shelter, WaIt
be·re you store the evacuatIon hose oN
toP oµ the ´oor pallet. .
. at Least untIL the
engIne
compartment
cooLs
´own.
ThereÐs enough heat In the comparÒent
to damage the hose.
57
³ToRE on dooR paL´µT
afTµR EnginE aREA coo´s