PS Magazine - TB 43-PS-443

PS, The Preventative Maintenance Monthly

ISSUE 443

OCTOBER 1989

PS Magazine - TB 43-PS-443 - Page 16 of 33
-
Unit-level
As
soon
as
possible-but
no
Longer than fOur hours later-clean tHe
area To be painted with thinner, NSN
8010±00±²³´µ³079.
Clean with thinner
ImmediateLy coat all bare metaL
suRfaces wiTh coating compound, NSN
8030¶00¶850·¸076.
Use a sponge to
appLy a thin Layer. ±his protects the sur²
f³ce a´d heµps the primer bond to the
surf³ce. Keep The compou´d oFf the
surrounding paint because it can keep
The primer ¶om bonding to old paint.
·fter the coating is dry-at least
30
minutes
but
no
more
than
24
hours-paint
it
with
primer,
NSN
80´0¶0´±´93¹05´6º
Stir each coMpo²
nent separatelY until uni¸rm. ¹ix the
two parts welL, then let ºtand
30
mi»
nutes be¸re you uºe the primer. Don't
save any miXed primer ove¼ight be½
cause it will harden in the pot witHin
´5
hours.
SpoNgE ON THE pRImE±,
fEATHERINg IT ovER THE EdgE of THE
oLd pAINT
²ppLy WALkWAy compouND³ ´S´
»¼½¾¿¾¾¿ÀÁ½¿ÂÃÄÃ
bEFoRE TopcoAT
unITÅLeveL
·Fter applicaTion, the primer wilL be dry hard in
30
to
90
minuteº and you
can add The C·¾C topcoat. Use ºingle part C·¾C. STir it Thoroughly, though,
befOre uºe. ¿ere are NSN'º fOr quaRt quantities:
BLAck
´S´
þ½Æ¿¾½¿ÇÇȿ»Á¾
BRoWN
ÄÃÄ
þ½Æ¿¾½¿ÇÇÈÉ»ÁÄ
GREEN
ÄÃÄ
´S´
þ½¾¿¾½¿ÇÇȿʻÁ¼
SANd
þ½¾¿¾½¿ÇÄÁ¿ÇÈÄÁ
±he topcoat wilL be dry To the touch i´
30
minutes. It wilL be dry through in
4
to
6
hours. It'Ll be cured enough to withstand impactÀlike waLking o´ iT-in
6
to
8
hours. Complete curing takes
7
to
´4
days.
µ¶·¸V¶¹ Pº»¼½
¾
reaÁ
any
leftover pai´T
as
Hazardous waste. ±Hat goes too
fOr
polyurethane
compone´t
Ë
"BÌ
if it goes bad in the can. It
should be clear to paLe yeLLow.
If itÂs thickened or crystalline in
consistency, seal it back up and
get rid of itÃ
HAZARDOUS
WasTE
FEDERAL lW PROHIBiS IMPROPeR DISPOSaL
IF FOND, CoACTlE NeREST P±CE² ³r
pUBLC s Au³ri´
on
tE
µ.S¶
±fom²³
PR³·C¸ AGENCY


Back to Top
Back to Top