PS Magazine - TB 43-PS-534

PS, The Preventative Maintenance Monthly

ISSUE 534

MAY 1997

PS Magazine - TB 43-PS-534 - Page 25 of 51
Step-by-Step Touch up
The topoat will b dry to the touch
i
aBoUt
30
minUtEs. It will BE dRy EnoUgH
t
wAlk on in fOUR to six hou±s² ComPlete cu³ing will tAke seven to
14
days´
µ¶eat Any leFove· Paint as haz¸dous wAste. ¹ollow yoU± Unit's
SOP
fOR P±oºR
dis»saL.
Paint Failures
¼casionAlly, you½ll gEt a C¾¿C ÀaÁluRe-ºElÁng PAÂnt-aÀteR aPPlication.
ÃeRe ARe some oÄ tHe cAUses:
ThE sÅ was not PRoºRly PREPAREd. Æoose oR BlistEREd PAintÇ sAnding dustÇ
g
oR oilÇ dÂesel Àuel-even ÀÂngeÈPÈÉnts ʸe enough to keeP CËC Ìom
sÍcKing to thE su±ÀacE.
No PrÂmeR wAs
ue.
The topoat wAs aPPlÎEd to Ba¸e mEtalÏ
ThE PRimER dÁd not HavE timE to dRy bбE Ñhe toPcoAt was aPPlÁEd.
THE sU±ÄacE was tÒ hot oR cold and thE Paint didnÓt have a chancE to cURE
P¸oÔ±LyÕ
¾s with most PaÁnt ÀailuResÇ yoU³ only choice is to stRiP ÑHe sÖt down to BARe
metAL And stA³t oveR.


Back to Top
Back to Top