PS 580
MAR 01
1
You are invited to send PS your ideas for improving maintenance
procedures, questions on maintenance and supply problems
and questions or comments on material published in PS.
Just write to:
MSG Half-Mast
The Preventive Maintenance Monthly
LOGSA, Bldg 5307
Redstone Arsenal, AL 35898-7466
Or e-mail to:
psmag@logsa.army.mil
Internet address:
TB 43-PS-580, The Preventive Maintenance Monthly, is an official pub-
lication of the Department of the Army, providing information for all
soldiers assigned to combat and combat support units and all soldiers
with unit maintenance and supply duties. All information published has
been reviewed and approved by the agency responsible for the equip-
ment, publication or policy discussed. Application of the information is
optional with the user. Masculine pronouns may refer to both genders.
FMTV Heater Fan Switch
FMTV Air Dryer Servicing
HMMWV Battery Safety
HMMWV Soft-top Door Zipper
HMMWV Window Cleaning
M939-Series Truck Safe Operating Speeds
M939-Series Tire Pressure Changes
Battery Grounding
M1074/M1075 PLS Transmissions
M872-Series Semitrailer Tires
2
3
4
5
6
7
7
8-9
10-11
10-11
WHEELED VEHICLES
2
Patriot Missile System Launcher Precautions
Patriot Missile System M985E1 Crane
40
41
MISSILES
40
Weapons Rack Requirements
AN/PAQ-4 Aiming Light
M9 Pistol Laser
42-43
43
43
SMALL ARMS
42
M42-Series Mask Upgrade
M40/M42-Series Mask MWO Check
44
45
NBC
44
46
47
48-49
50-51
COMMUNICATIONS
46
12
COMBAT VEHICLES
ISSUE 580
MARCH 2001
M1-Series Tank Spent Casing Box
M1-Series Tank Blade Lifting Straps
M1-Series Tank Oil Filter
M2/M3-Series Bradley M242 Drive Motor
MLRS Carrier Fire Suppression System
M113A3 FOV MRE Heater
M113A2 FOV Air Cleaner Elements
M88A1 Recovery Vehicle Sediment Bowl
M88A1 Recovery Vehicle Towing Procedures
M109-Series SP Howitzer Recuperators
Personnel Heater Repair
12-13
13
14
15
16-17
17
18-20
20
21
22
23
SEE Front Bucket Reminders
SEE Overlooked Grease Fittings
DEUCE Rock Guard
MHE 270/271 Forklift Fuel Tank Gasket
M10A Forklift Hydraulic Oil Filter O-ring
6K VRRT Forklift Transmission Boot
COMBAT ENGINEERING
AVIATION
24
25
26
26
26
26
24
35
PS, The Preventive Maintenance Monthly
(ISSN 0475-2953) is published monthly by the Department of the Army, Redstone
Arsenal, AL 35898-7466. Periodical Postage is paid at the Huntsville, AL post office and at additional mailing offices.
Postmaster:
Send address changes to PS, The Preventive Maintenance Monthly, LOGSA, Redstone Arsenal, AL 35898-7466
Tick, tick, tick.
That’s the sound of time moving
steadily on. Each tick of the clock is a
moment that’s precious and unrecover-
able.
It’s a chance to lube a roadwheel,
check a tire’s air pressure, or tighten a
loose radio connector.
Tick, tick, tick.
Do you spend your time wisely? Or
do you put off maintenance now in
hopes there will be time to do it tomor-
row?
The day may come when your life
depends on just how much time you’ve
spent maintaining your equipment. Will
it be ready? Will you?
Tick, tick, tick.
SINCGARS Self-test
SINCGARS Manpack Antenna
PLGR Batteries
AN/PVS-14 NVD Battery Retainer Covers
High Security Lock Maintenance
Army Award for Maintenance Excellence
56-59
60
SOLDIER SUPPORT
56
Ten Percent Maintenance Variance
52-55
LOGISTICS MANAGEMENT
52
ERIC K. SHINSEKI
General, United States Army Chief of Staff
JOEL B. HUDSON
Administrative Assistant to the Secretary of the Army
COMSEC Equipment Replacement Knobs
AH-64A/D FOD Problem
OH-58 Honeycomb Panel Protection
UH-60 Access Panels
CH-47D Ramp Operation
35
36
37
38
39
By order of the Secretary of the Army:
Official:
0101810
580. 00-01 (C)
1/29/01
9:39 PM
Page 1