OVERHAUL INSPECTIon PRoCeDURE
-
·
I
TE
M:
NO.
1
2
3
TUBE ASSeMbLY,
M±TAl:
manifold AIr heAter fuel returN to
soLenoiD vAlve,
left ba±k
R
Lm
CARcTIStI±
•Aol
CRAcKed² bent² o³
0.0
obstrUcted TuBe
´aMAged fl a red
1µ0
tuBe ends
´aMaged nut and
¶·0
s¸eeves
DMR 9·2815±220
oIP
1¹68402º
ReFereNCE±
FiGure 5-8» (¼/655}
ITeM²
3
InSP
M²H³D
rIsItE
VIs½A¾
¿O±E allowÀd
ÁIsual
Âonà AÄÄoWed
ÁIsÅAl
¿one AlloWed
´Uµed ¶·p¸¹e¹º» a¹d ¼½fi¾¿µhÀ ÁÂÃºÄ ÅeÆÇveÈed µ ÉÊËduÌºÄ ËF diÄÂĵ81bÍy w¿ÎÏ
²
ex·i¾À
10%
By
ºÐe ̸¹ºÈaѺËÈ ºË ÒeºeÓÔ¾e µeÃv¿ÌeabiÕiºyÖ Aר'» aÃe µÁeÆif¿À fÇÙ GÇveÚ·e¹º Û¿ÜaÎ
ÂÝd VeÞ¿FÔÆaºi¸Ü IÜßɽ̺i˹ ǹÎyà
Æ/664
';
,_
SHee³
³
OF
¶