TB-9-2320-279-13-1

TECHNICAL BULLETIN; AIR CONDITIONING SYSTEM

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS

DECEMBER 2005

  TB-9-2320-279-13-1 - Page 208 of 524

TB 9-2320-279-13-1
0017-2
AC 20 AMP CIRCUIT BREAKER REPLACEMENT - Continued
DRAFT
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2. Remove locknut (4) from terminal (5).
NOTE
Tag and mark wires prior to removal to ensure proper installation.
3. Remove locknut (6) and wire (7) from terminal (8).
4. Remove bus bar (9) from two terminals (5 and 8).
5. Remove locknut (10), wire (11), and wire (12) from terminal (13).
NOTE
Note position of circuit breaker prior to removal to ensure proper installation.
6. Remove circuit breaker (14).
HEMAC023


Back to Top