5
1
TIRE INFLATION
CONNECTOR
AIR
RESERVOIR NO. 4
WINCH
DECLUTCH
VALVE
WINCH
TENSIONER
VALVE
HEAVY-DUTY
WINCH
CABLE
TENSIONER
2
4
6
3
HEAVY-DUTY
WINCH
Figure 1.
END OF TASK
FOLLOW-ON MAINTENANCE
1. Start engine and build air pressure to 120 to 125 psi (827 to 862 kPa) (refer to TM 9-2320-279-10).
2. Check air system for leaks. (refer to TM 9-2320-315-14&P).
3. Shut OFF engine (refer to TM 9-2320-279-10).
4. Remove wheel chocks (refer to TM 9-2320-279-10).
END OF WORK PACKAGE
TB 9-2320-279-13&P-4
0043
0043-4