TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 13 of 168

TB 9-2320-280-35-15
3-1/(3-2 blank)
CHAPTER 3
COMPLETION TIME FOR INSTALLATION
A total of 20 man hours are required for two personnel to install the C4ISR equipment. Typical vehicle
downtime is 12 hours.


Back to Top