TB 9-2320-302-13&P-1
0033 00-1
MAINTENANCE ALLOCATION CHART (MAC)
0033 00
Table 1. MAC for the Crew Protection Kit
(1)
GROUP
NUMBER
(2)
COMPONENT/
ASSEMBLY
(3)
MAINTENANCE
FUNCTION
(4)
MAINTENANCE LEVEL
(5)
TOOLS AND
EQUIPMENT
REF CODE
(6)
REMARKS
CODE
FIELD
SUSTAINMENT
UNIT
DS
GS
DEPOT
COF
H
D
33
SPECIAL PURPOSE
KITS
3307
Crew Protection Kit:
Install
46.0
8
Vehicle Preparation
16.0
A-Pillar Armor
Inspect
0.2
A
Install
2.0
8
Replace
2.0
8
Cab Support
Reinforcement
Inspect
Install
0.2
2.0
5,6,7,8
A
Replace
2.0
5,6,7,8
Cowl Armor
Inspect
0.2
A
Install
2.0
5,6,7,8
Replace
2.0
5,6,7,8
Door Assembly
Inspect
0.2
A
Service
0.2
B
Install
2.5
5,6,7,8
Replace
2.5
5,6,7,8
Door Handle
Assembly
Inspect
Install
Replace
0.2
1.0
1.0
8
8
A
Door Latch
Inspect
0.2
A
Install
1.0
8
Replace
1.0
8
Door Ballistic Glass
and Frame Assembly
Inspect
Service
0.2
0.2
A
B
Replace
2.0
8
Door Latch
Adjustment
Inspect
Service
0.2
0.5
8
A
Escape Hatch
Inspect
0.2
A
Install
2.5
8
Replace
2.5
8
Floor Armor
Inspect
0.2
A
Install
3.0
8
Replace
3.0
8
Firewall Armor
Inspect
0.2
A
Install
3.0
8
Replace
3.0
8