3-62.1. RADIATOR AND FAN SHROUD ASSEMBLY MAINTENANCE
(SERIAL NUMBERS 300000 AND ABOVE) (Cont’d)
TB 9-2320-335-13&P
3-26
10.
Install crossbrace (14) on two airlift brackets (17) with four lockwashers (16) and capscrews (15).
11.
Tighten outboard nut (18) and locknut (19) on crossbrace (14) until slack is removed.
12.
Secure pressure valve bracket (13) to bracket (12) with two washers (9), lockwashers (10), and
capscrews (11).
13.
Install surge tank-to-radiator vent hose (8) on adapter (6) with hose clamp (7). Tighten hose clamp
(7) to
10–20 lb-in. (1–2 N
•
m).
14.
Install lower radiator hose (5) on radiator (3) with hose clamp (4). Tighten hose clamp (4)
85–95 lb-in. (9.6–10.7 N
•
m).
15.
Install radiator inlet hose (1) on radiator (3) with hose clamp (2). Tighten hose clamp (2)
85–95 lb-in. (9.6–10.7 N
•
m).