TB-9-2350-277-40-P-4

CARRIER, COMMAND POST, FULL-TRACKED, ARMORED, M577A3; STANDARD INTEGRATED COMMAND POST SYSTEM (SICPS), M1068A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 4 OF 4

JUNE 2009

  TB-9-2350-277-40-P-4 - Page 93 of 100

RECOMMENDED CHANGES TO PUBLICATIONS
AND BLANK FORMS
For use of this form, see AR 25-30; the proponent agency is ODISC4.
Use Part II (reverse) for Repair Parts and
Special Tool Lists (RPSTL) and Supply
Catalogs/Supply Manuals (SC/SM).
DATE
U.S. Army TACOM Life Cycle Management Command
ATTN:
AMSTA-LC-LMPP/TECH PUBS
1 Rock Island Arsenal, Rock Island, IL 61299-7630
FROM: (Activity and location) (Include ZIP Code)
PART I – ALL PUBLICATIONS (EXCEPT RPSTL AND SC/SM) AND BLANK FORMS
PUBLICATION/FORM NUMBER
DATE
TITLE
Installation of Crew II Modification Kit 19207 for
TB
9-2350-277-40&P-4
30 June 2009
Carrier, Armored, M577AE & SICPS M1068A3
ITEM
NO.
PAGE
NO.
PARA-
GRAPH
LINE
NO. *
FIGURE
NO.
TABLE
NO.
RECOMMENDED CHANGES AND REASON
(Provide exact wording of recommended changes, if possible).
*Reference to line numbers within the paragraph or subparagraph.
TYPED NAME, GRADE OR TITLE
TELEPHONE EXCHANGE/AUTOVON, PLUS
EXTENSION
SIGNATURE
DA FORM 2028, FEB 74
REPLACES DA FORM 2028, 1 DEC 68, WHICH WILL BE USED.
USAPPC V3.00
TO:
(Forward to proponent of publication or form)(Include ZIP Code)


Back to Top