TM 1-1730-227-13&P
0009 00
STANDARD AIRCRAFT MAINTENANCE TRAILER
SERVICE UPON RECEIPT
INITIAL SETUP:
Materials/Parts
Grease, Automotive (WP 0035 00, Item 1)
References
DA PAM 738-751
SF 364
References (cont.)
WP 0018 00
WP 0020 00
WP 0025 00
SERVICE UPON RECEIPT OF MATERIEL
UNPACKING
1.
Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with instructions in DA PAM 738-751.
2.
When the trailer is received, the tow bar assembly will be removed and secured to the trailer for shipping
purposes. Remove the tow bar from it’s secured position and install according to installation instructions in
WP 0018 00, Tow Bar Assembly.
CHECKING UNPACKED EQUIPMENT
1.
Inspect the equipment for damage incurred during shipment. If equipment has been damaged, report the
damage on SF 364, Report of Discrepancy (ROD).
2.
Check to see if the equipment has been modified.
PROCESSING UNPACKED EQUIPMENT
Before putting into service, the following checks and services must be completed.
TIRE PRESSURE
Recommended tire pressure is
65 psi
.
LUBRICATION OF GREASE FITTINGS
Grease fittings are to be lubricated using Grease, Automotive . The following points are to be greased:
TIE ROD ASSEMBLY
Tie Rod ends (Figure 1). One fitting at each end of two tie rods.
Figure 1.
Tie Rod Assembly.
0009 00-1