APPENDIX 2-L
COLORING CODING
SUPPLEMENTAL OPERATING, MAINTENANCE AND REPAIR PARTS INSTRUCTIONS
SOMARPI-5-3805-254
Truck, Dump 20 Ton, 6X4, On-Off Highway
71,000 GVW, Commercial Construction Equipment
1.
Fittings located on vehicle engine compartment fire wall are same size and diameter.
2.
Four fittings require disconnection during power plant removal.
3.
To insure proper connections are made during power plant replacement, color coding of these lines are.
recommended.
4.
Upon receipt of the subject equipment, lines should be color coded in accordance with the attached color
coding figure.
222