TM-5-3805-254-20-2

TRUCK, DUMP, 20 TON, 6X4, ON-OFF HIGHWAY 71,000 GVW, IHC MODEL F-5070 (CCE)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL VOLUME 2 OF 2

JANUARY 1988

  TM-5-3805-254-20-2 - Page 213 of 971

TM 5-3805-254-20-2
RIGHT INSTRUMENT PANEL OPTICAL RIBBON - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION
NOTE
Steps given are typical for the installation of four identification tabs into four bezels.
When installing optical ribbon be sure to start at end farthest away from optical light assembly.
5. Rear of instrument
Bezel (2) and iden-
a. Put in place.
panel (1)
tification tab (3)
b. Push identification tab into bezel.
c. Repeat step b until all identification tabs
are installed in bezels.
6. Optical light
Optical ribbon (5)
Push in.
assembly (4)
7. Lower center instru-
Two screws (7) and
a. Put bracket in place.
ment panel (6)
bracket (8)
b. Screw in and tighten using number one
cross-tip screwdriver.
TA244245
2-862


Back to Top