TM-5-3805-254-34

TRUCK, DUMP, 20 TON, 6X4, ON-OFF HIGHWAY 71,000 GVW

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

MARCH 1993

  TM-5-3805-254-34 - Page 541 of 727

TM 5-3805-254-34
14-8.
CAB CROSSMEMBER BRACKETS REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Tools/Test Equipment:
Front fuel tank supports removed (see TM 5-3805-
General mechanic's tool kit
254-20).
Field automotive shop set
Battery box and brackets removed (see TM 5-3805-
254-20).
Personnel Required
: Two
Cab crossmember removed (see paragraph 15-4).
NOTE
Left and right crossmember brackets are replaced in the same manner.
a.
REMOVAL
Remove 12 nuts (1), screws (4), and two crossmember brackets (3) from frame (2).
b.
INSTALLATION
Install two crossmember brackets (3) on frame (2) with 12 screws (4) and nuts (1).
FOLLOW-ON TASKS:
Install battery box and brackets (see TM 5-3805-254-20).
Install front fuel tank supports (see TM 5-3805-254-20).
Install cab crossmember (see paragraph 15-4).
TA704111
14-16


Back to Top