TM-5-3895-371-24-P

BITUMINOUS DISTRIBUTOR BODY M918, MODEL D-63

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST

MARCH 1981

  TM-5-3895-371-24-P - Page 297 of 330

TM 5-3895-371-24 & P
e.
Install two tapered pins (9).
f.
Screw float ball (3) onto stem assembly (5) and install cotter pin (4).
12-5. Installation of Gage. (Refer to fig. 12-1.)
a.
Install copper gasket (17).
b.
Insert tank gage assembly (1) through tank.
c.
Install two tank gage nuts (23). Tighten nut closest to tank securely and lock with second
nut.
d.
Line up dial plate assembly (25) and secure with five capscrews (24).
e.
Place tank gage dial (26) over dial plate assembly (25) so that dowel pin on dial plate assem-
bly (25) is through hole in tank gage dial (26).
f.
Install end bearing plate (29) and secure with two hex nuts (28).
g.
Install indicator (27) with float ball (3) on bottom of tank, then tighten setscrew (32) with
indicator at zero.
h.
install switch actuator (34) and adjust so that micro switch (33) is activated at 50 gallons
then tighten setscrew (31). This will prevent the tank from going completely dry during operation.
i.
Check operation.
12-4


Back to Top