TM 5-3895-372-10
CAUTION
Clean the mixer and lubricate the mixing auger bearings whenever you stop concrete production.
Do not wait until the end of the day.
c. Clean Up the Mixer. See paragraph 3-7.
d. Disengage the PTO. See TM 9-2320-273-10.
e. Perform Your After (A) PMCS. See table 3-1.
f. Close the Air Shutoff Valve. (See fig. 2-43.) Turn it all the way clockwise.
g. Remove and Stow the Delivery Chutes. (See fig. 2-44.)