TM 5-4210-249-13&P-1
0097-15/(16 blank)
DRAFT
0097
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house panel S (WP 0540)
2.
Remove wheel chocks (TM 9-2320-347-10)
END OF TASK
END OF WORK PACKAGE
TFFT02837
Step 17.
Put bumper turret power switch to
{
(off) position (WP 0004).
Turn battery disconnect
switch to OFF position (WP 0004).
With a test lead set, check for continuity across wire
2200 (black) from valve control wire harness bumper turret foam A foam system flow
control manifold connector, terminal 2 to a known good ground.
a.
If there is continuity, replace bumper turret foam A metering control
valve (WP 0288).
b.
If there is no continuity, repair wire 2200 in valve control wire harness if
repairable (TM 9-2320-325-14&P), or replace valve control wire
harness (WP 0463).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION