TM 5-4210-249-13&P-2
0213-1
DRAFT
0213
FIELD LEVEL MAINTENANCE
CREW CAB AIR CONDITIONER EXPANSION VALVE REPLACEMENT
INITIAL SETUP:
REMOVAL
1.
Remove insulation tape (1) from two fittings (2) and (3) and hoses (4) and (5).
NOTE
Tag and mark hoses prior to removal to ensure proper installation.
2.
Remove two fittings (2) and (3) and preformed packings (6) and (7) from expansion valve (8).
Discard
preformed packings.
3.
Remove two hoses (4) and (5) and preformed packings (9) and (10) from expansion valve (8).
Discard
preformed packings.
4.
Remove screw (11), washer (12), and expansion valve (8) from air conditioner/heater assembly (13).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01997
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Bork Insulation Tape (WP 0625, Item 10)
Preformed Packing (2)
Preformed Packing (2)
Personnel Required
MOS 52C Utilities equipment repairer
References
WP 0614, Fig. 7
Equipment Conditions
Crew cab bench seat and access panel removed
(WP 0501)
Crew cab air conditioner coolant recovered
(WP 0217)