TM 5-4210-249-13&P-3
0506-3/(4 blank)
DRAFT
0506
3.
Push window (4) completely up.
4.
Install two screws (10) on channel (8).
5.
Install seal (9) on channel (8).
6.
Install channel (8) in door (6).
7.
Lower window (4) to stop (5).
8.
Install two locknuts (7) on channel (8).
9.
Install regulator (3) on door (6) with four lockwashers (2) and screws (1).
10. Lower window (4) and install regulator (3) in channel (11).
11. Install regulator (3) on door (6) with two remaining lockwashers (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install crew cab outer door handle (WP 0503)
END OF TASK
END OF WORK PACKAGE