TM 5-4210-249-13&P-3
0511-1/(2 blank)
DRAFT
0511
FIELD LEVEL MAINTENANCE
CREW CAB ROOF HATCH DOOR SWITCH GUARD REPLACEMENT
INITIAL SETUP:
REMOVAL
Remove four screws (1), washers (2), and switch guard (3) from vehicle.
END OF TASK
INSTALLATION
Install switch guard (3) on vehicle with four washers (2) and screws (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close crew cab roof hatch (WP 0018)
2.
Remove wheel chocks TM 9-2320-347-10
END OF TASK
END OF WORK PACKAGE
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01991
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
References
WP 0615, Fig. 122
Equipment Conditions
Water pump engine OFF (WP 0022)
Engine OFF TM 9-2320-347-10
Wheels chocked TM 9-2320-347-10
Crew cab roof hatch opened (WP 0018)