TM 5-4210-249-13&P-3
0541-5
DRAFT
0541
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Install rubber stop (13) on vertical platform support (9) with screw (12).
6.
Install rubber holddown (11) on vertical platform support (9) with two screws (10).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7.
Install vertical platform support (9) on pump operator’s platform (4) with hinge (8), four screws (7), and
locknuts (6).
TFFT00092
TFFT00091