TM 5-4210-249-13&P-3
0336-1
DRAFT
0336
FIELD LEVEL MAINTENANCE
PUMP OPERATOR’S PANEL TEST GAUGE PANEL REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
Tag and mark connectors prior to removal to ensure proper installation.
1.
Disconnect two connectors (1) from governor control pressure transducers (2).
2.
Disconnect connector (3) from output pressure transducer (4).
3.
Disconnect connector (5) from input pressure transducer (6).
NOTE
Tag and mark air lines prior to removal to ensure proper installation.
4.
Remove two air lines (7) from elbows (8) and (9).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01634
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Compound, Sealing, Pipe Thread
(WP 0625, Item 21)
Tags, Identification (WP 0625, Item 51)
Lockwasher (1)
Personnel Required
MOS 63B Wheeled vehicle mechanic (2)
References
WP 0615, Fig. 56
Equipment Conditions
Batteries disconnected (TM 9-2320-325-14&P)
Pump operator’s panel housing opened
(WP 0325)