TM 5-4210-249-13&P-3
0361-1
DRAFT
0361
FIELD LEVEL MAINTENANCE
120-VOLT POWER CORD(S) REPLACEMENT
INITIAL SETUP:
REPLACEMENT
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Remove cable ties and cushion clips as required.
•
This procedure only shows routing of 120-volt power cords.
It will never be necessary to
remove all 120-volt power cords at once.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
References
WP 0615, Fig. 75
Equipment Conditions
120-Volt receptacle removed
(if necessary) (WP 0362)
Equipment Conditions (continued)
Water tank heater power cord removed
(if necessary) (WP 0300)
Piping heat trace power cord removed
(if necessary) (WP 0604)
Cord reel power cord removed
(if necessary) (WP 0381)
Crew cab air conditioner/heater control box power
cord removed (if necessary) (WP 0201)
Battery chargers(s) receptacle removed
(if necessary) (WP 0365)
120-Volt power cord removed from circuit breaker
box (WP 0373)