TM 5-4210-249-13&P-3
0400-1
DRAFT
0400
FIELD LEVEL MAINTENANCE
PERSONNEL CAB POWER DISTRIBUTION BLOCK REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
Tag and mark wires prior to removal to ensure proper installation.
1.
Disconnect connector (1).
2.
Disconnect two connectors (2) and (3).
3.
Remove seven screws (4) from instrument panel assembly (5) and move instrument panel assembly (5)
aside.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01632
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Lockwasher (2)
Locknut (1)
Locknut (1)
Locknut (1)
Personnel Required
MOS 63B Wheeled vehicle mechanic (2)
References
TM 9-2320-325-14&P
WP 0615, Fig. 55
Equipment Conditions
Siren control removed (WP 0341)
Distribution block relays removed (WP 0402)
Distribution block fuses removed (WP 0401)
Distribution block circuit breakers
removed (WP 0398)
Distribution block diode blocks
removed (WP 0399)