TM 5-4210-249-13&P-3
0441-1
DRAFT
0441
FIELD LEVEL MAINTENANCE
CAB POWER DISTRIBUTION WIRE HARNESS AND BLOCK REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Note routing of cab power distribution wire harness prior to removal to ensure proper
installation.
•
Note position and remove cable ties, split loom, and cushion clips as required.
1.
Remove nut (1), lockwasher (2), and eight wires 1138 (3) from cab 24 VDC terminal block (4).
Discard
lockwasher.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT03160
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Tags, Identification (WP 0625, Item 51)
Ties, Cable, Plastic (WP 0625, Item 58)
Lockwasher (3)
Lockwasher (1)
Locknut (8)
References
TM 9-2320-325-14&P
WP 0615, Fig. 93
Equipment Conditions
Cab instrument panel assembly
removed (WP 0311)
Cab power distribution block circuit breakers
removed (WP 0398)
Cab power distribution block diode
removed (WP 0399)
Cab power distribution block relays
removed (WP 0400)