TM-5-4210-249-13-P-3

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 3 OF 4

FEBRUARY 2009

  TM-5-4210-249-13-P-3 - Page 827 of 1488

TM 5-4210-249-13&P-3
0459-21
DRAFT
0459
INSTALLATION
NOTE
Route pump operator’s panel wire harness as noted prior to removal.
Install cable ties, split looms, and cushion clips as noted.
1.
Install pump operator’s panel wire harness (205) into vehicle.
2.
Connect pump operator’s panel wire harness connector DO 2 (203) to main wire harness DO 2
connector (204).
3.
Connect pump operator’s panel wire harness connector DO 1 (201) to main wire harness DO 1
connector (202).
4.
Connect pump power distribution connector DP 2 (199) to pump house distribution box DP 2 connector (200).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Install wire 3895 (197) to pump house ground bolt (198) with lockwasher (196) and nut (195).
TFFT03314


Back to Top