TM 5-4210-249-13&P-3
0459-21
DRAFT
0459
INSTALLATION
NOTE
•
Route pump operator’s panel wire harness as noted prior to removal.
•
Install cable ties, split looms, and cushion clips as noted.
1.
Install pump operator’s panel wire harness (205) into vehicle.
2.
Connect pump operator’s panel wire harness connector DO 2 (203) to main wire harness DO 2
connector (204).
3.
Connect pump operator’s panel wire harness connector DO 1 (201) to main wire harness DO 1
connector (202).
4.
Connect pump power distribution connector DP 2 (199) to pump house distribution box DP 2 connector (200).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Install wire 3895 (197) to pump house ground bolt (198) with lockwasher (196) and nut (195).
TFFT03314