TM 5-4210-249-13&P-4
0579-13
DRAFT
0579
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
25. Install two pins (1) on handle bracket (2).
26. Test roof turret operation (WP 0036).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Perform Step (27) if proper flow pattern of roof turret is not being achieved.
27. Adjust two jamnuts (18) and (40) and cable (22).
28. Repeat Steps (26) and (27) until proper flow pattern of roof turret is achieved.
END OF TASK
TFFT0275
TFFT00277A