TM 5-4210-249-13&P-4
0567-9/(10 blank)
DRAFT
0567
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install bumper turret cover (if required) (WP 0569)
2.
Install pump house panels A and S (if required) (WP 0540)
END OF TASK
END OF WORK PACKAGE
Table 5.
Foam Metering Control Valve Manifold to Shutoff Control Valve Manifold and
Multi-metering Valve Air Lines.
Hose
Item No.
Color
From
To
1
Blue
Foam Metering Control Valve Manifold
Flush
Shutoff Control Valve Manifold Flush
2
Blue
Foam Metering Control Valve Manifold
Foam “A”
Shutoff Control Valve Manifold Foam “A”
3
Blue
Foam Metering Control Valve Manifold
Foam “B”
Shutoff Control Valve Manifold Foam “B”
4
Blue
Foam Metering Control Valve Manifold
Roof Turret “A” No. 4
Multi-metering Valve Roof Turret “A”
5
Blue
Foam Metering Control Valve Manifold
Bumper Turret “A” No. 5
Multi-metering Valve Bumper Turret “A”
6
Blue
Foam Metering Control Valve Manifold
Ground Sweeps “A” No. 6
Multi-metering Valve Ground Sweeps “A”
7
Blue
Foam Metering Control Valve Manifold
Roof Turret “B” No. 1
Multi-metering Valve Roof Turret “B”
8
Blue
Foam Metering Control Valve Manifold
Bumper Turret “B” No. 2
Multi-metering Valve Bumper Turret “B”
9
Blue
Foam Metering Control Valve Manifold
Ground Sweeps “B” No. 3
Multi-metering Valve Ground Sweeps “B”