TM 5-5420-203-14
d. Loading/Unloading the Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp
- CONT
(1) Loading.
(a) Launch the first bridge flat on the surface in open area. Refer to paragraph 2-8a for launching
procedures. Ensure there is enough room for the approach and departure of a truck with a
flatbed trailer.
(b) Line up the truck and the flatbed trailer with the approach ramp of the launched
drive the truck and flatbed trailer over the bridge as shown below.
bridge and
Change 2 2-95