TM-5-5420-203-14

BRIDGE, ARMORED VEHICLE LAUNCHED, SCISSORING TYPE CLASS 60 & CLASS 70 ALUMINUM, 60 FOOT SPAN; FOR M48A5 AND M60 LAUNCHER

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE

JUNE 1991

  TM-5-5420-203-14 - Page 286 of 298

TM 5-5420-203-14
INDEX - CONT
Subject
Paragraph
Table (T)
P - CONT
Preparation for Movement .
.......................................................................
2-10
Movement of AVLB by Launcher Vehicle .
..........................................
2-10a
Movement of AVLB by Flatbed Trailer .
..............................................
2-10b
Preparation For Storage Or Shipment .
.....................................................
1-5
Preparation Maintenance Checks and Services (PMCS).
........................
2 - 2
Preventative Maintenance Checks and Services (PMCS) Table.
. .......... ..
T2-2
Principles of Operation.
..............................................................................
1-10
Q
Quadrant, Installation.
...............................................................................
2-3c(21)
Quadrant, Installation.
. .............................................................................
2-5c(19)
Quadrant Hinge Pins, Installation .
..........................................................
2-3c(13)
Quadrant Hinge Pins, Installation .
...........................................................
2-5c(18)
Quadrant Replacement.
.............................................................................
3-12
Quadrant Replacement.
.............................................................................
3-13
Quadrant Struts, Installation .
...................................................................
2-3c(22)
Quadrant Struts, Installation .
..................................................................
2-5c(20)
R
Ramp Curb Replacement.
. .........................................................................
.3-12
Ramp Section Replacement (Far-Shore).
..................................................
.3-12
Ramp Section Replacement (Near-Shore) .
...............................................
.3-12
Ramp Section Deck Extrusion Replacement.
. ..........................................
.3-12
Ramp Section Lateral Brace Replacement (Near and Far-Shore).
..........
3-12
Ramp Section Miscellaneous Components Replacement.
........................ .
3-12
Ramp Section Hard Hydraulic Piping Replacement.
...............................
.3- 12
Ramp Section Transverse Brace Replacement (Far-Shore).
.................... .
3- 12
Ramp Section Transverse Brace Replacement (Near-Shore) .
..................
3- 12
Rear Transverse Braces Replacement (Near-Shore).
...............................
.3- 13
Rear Transverse Braces Replacement (Far-Shore) .
.................................
.3- 13
Recommended Changes to DA Publication .
............................................
..A-2
Recommended Changes to Equipment Technical Publication .
................
A-2
Recovery by Other Than a Launcher.
. ......................................................
.2-9f
Recovery/Retrieval of Impacted Bridge .
....................................................
2-9e
Recovery Using a Towing Vehicle.
.............................................................
2-9f
Recovery With a Crane.
..............................................................................
2-9f
References .
................................................................................................
..A - 1
Removal and Replacement Procedures.
....................................................
.3- 12
Removal and Replacement Procedures.
....................................................
.3- 13
Repair of Rivets by Bolt Substitution .
.......................................................
3- 10
Index-8
Change
2


Back to Top