TM 9-1240-401-34&P
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Adjust pressure regulator (1) by rotating handle (4)
until pressure gage (5) indicates 5 psi (34.47 kPa).
Close nitrogen tank valve (2).
Install preformed packing on bottom of cover as-
sembly (6).
Secure cover assembly (6) to fabricated leak test
adapter (7) with four machine screws (8) and four
wing nuts (9).
Connect hose assembly (10) to inlet port(11) on
fabricated leak test adapter (7).
Adjust handle (4) counterclockwise until 1 psig
(6.89 kPa) is registered on the low pressure gage
(5).
Maintain a 1 psig (6.89-kPa) pressure for 10 sec-
onds, then turn handle (4) clockwise to the closed
position.
Disconnect hose assembly (10) from the inlet port
(11) and lay hose assembly (10) aside.
Completely immerse cover assembly (6) and fabri-
cated leak test adapter (7) in a container of clear
water.
While cover assembly (6) is immersed, inspect the
area around the lamp shell (12) for air bubbles that
indicate a pressure leak.
Remove cover assembly (6) and fabricated leak
test adapter (7) from the container of clear water.
Release pressure from fabricated leak test adapter
(7) at inlet port (11).
Remove four wing nuts (9), four machine screws
(8), and cover assembly (6) from fabricated leak
test adapter (7).
If air bubbles were detected, repair cover assembly
(ref. para 3-17) and repeat the cover assembly
leakage test.
If air bubbles were not detected, use a clean, dry
wiping rag to dry cover assembly.
3-55/(3-56 blank)