TM-9-2320-209-10-1

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; OPERATION, INSTALLATION AND REFERENCE DATA; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-1 - Page 209 of 549

TM 9-2320-209-10-1
FRAME 5
1.
To drain manifold pipes (1):
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
Place delivery line (2) on gravity delivery line gate valve (3). (Refer to
para 4-9 f. )
Check that discharge valve control levers (4) are in closed (forward)
position.
Turn left and open gravity delivery line gate valve (3).
Let water and fuel drain from manifold pipes (1) into container (5).
Turn right and close gravity delivery line gate valve (3).
Take delivery line (2) from gravity delivery line gate valve (3). (Refer to
para 4-9 f.)
Unclip ground wire (6) and let it rewind on reel.
Close rear compartment doors (7).
CAUTION
Authorized procedures must be used to get rid of the fuel
drained into the container.
4-155


Back to Top