TM-9-2320-209-20-3-2

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 2 OF 4

MAY 1981

  TM-9-2320-209-20-3-2 - Page 203 of 552

TM 9-2320-209-20-3- 2
FRAME 4
CAUTIO N
1 .
2 .
3 .
Do not tighten coupling nuts too much. Screw on an d
finger tighten coupling nuts onto fittings, then usin g
wrench, tighten nuts 1/8 turn .
Put tube (1) between two elbows (2) as shown .
Using 13/16-inch wrench, screw on and tighten two coupling nuts (3) .
Using 5/8-inch wrench, screw on and tighten two coupling nuts (4) on te e
fitting (5) .
NOT E
Follow-on Maintenance Actio n
1. Start engine and let air pressur e
TM 9-2320-209-10 .
Required :
build .
Refer t o
2. Do leak test of air svstem. Refer to Part 1, para 1-5 .
3. If working on truck M275A2, replace right rea r
splash guard .
Tell direct support maintenance .
4. If working on truck M342A2, replace muffler and rea r
exhaust pipe .
Refer to Part 1, para 5-3 .
END OF TAS K
13-19 0


Back to Top