TM 9-2320-209-20-3- 2
FRAME 2
Soldiers 1 .
Lift air reservoir (1) into position .
A and B
Soldier A 2 .
Hold air reservoir (1) in place. Tell soldier B when ready .
Soldier B 3 .
Working at front of air reservoir (1), put U-bolt (2) in place .
Using 1/2-inch drive ratchet and 7/16-inch socket, screw o n
and tighten two locknuts (3) .
4 .
Working at rear of air reservoir (1), do step 3 again for rea r
U-bolt (4) .
CAUTIO N
D
O not over tighten coupling nuts. Screw on and finge r
tighten coupling nuts on fittings, then using 5/8-inc h
wrench, tighten nuts 1/8 turn .
5 .
Using 5/8-inch wrench, screw on and tighten two coupling nuts (5) .
Soldiers 6 .
Do steps 1 through 4 again for air reservoir (6) .
A and B
GO TO FRAME 3
13-23 4