TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 665 of 1337

TM 9-2320-260-20
8-21. DOUBLECHECK VALVE REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
EQUIPMENT CONDITION
All
Parking brake set (TM 9-2320-260-10).
MATERIALS/PARTS
Air reservoirs drained (TM 9-2320-260-10).
Transfer to front-rear axle propeller shaft removed
Locknut
(para. 7-2).
Antiseize tape (Appendix C, Item 30)
REFERENCES (TM)
GENERAL SAFETY INSTRUCTIONS
Do not disconnect air lines before draining air
TM 9-2320-260-10
reservoirs.
TM 9-2320-260-20P
WARNING
Do not disconnect air lines before draining air reservoir. Small
parts under pressure may shoot out with high velocity, causing
injury to personnel.
NOTE
M815, M818, and M819 vehicles are equipped with front and
rear doublecheck valves. This procedure covers only the rear
doublecheck valve.
Tag all air lines for installation.
1. Disconnect air lines (1) and (14) from elbows (2) and (13).
2. Disconnect air line (5) from adapter (4).
3. Remove locknut (11), screw (15), and check valve (12) from frame (10). Discard locknut (11).
NOTE
Note position of elbows for installation.
4. Remove adapter (4), elbows (13) and (2), connector (3), and nipple (16) from check valve (12).
5. Remove air lines (6) and (9) from tee (8).
6. Remove tee (8) from check valve (7).
8-40


Back to Top