TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 95 of 1337

TM 9-2320-260-20
Table 2-1. Unit Level Preventive Maintenance Checks and Services (Contd).
ITEM TO
NOT FULLY
ITEM
INTERVAL
CHECK/
PROCEDURE
MISSION
SERVICE
CAPABLE IF
13
Semi-
Alternator
a.
Inspect alternator (6) for secure mounting.
annual
and
b.
If loose, tighten two screws (1) on alternator
Alternator is
alternator
adjusting link (2) 25-31 lb-ft (34-42 N
m).
loose or screws and
wiring
c.
Tighten two nuts (5) and screws (3) on each side of
nuts missing.
alternator mounting bracket (4) 50-55 lb-ft (68-75 N
m).
d.
Inspect alternator wiring for burned or frayed wires
Wiring insulation
and loose or broken terminal connections. Tighten if
is missing, frayed,
loose. Replace or repair wiring if burned, frayed, or
split, or poor
broken (para. 4-52).
connections are
evident.
.
14
Semi-
Preheater
Inspect tubing (8) and wiring (7) for loose connections
annual
nozzle and
and leaks. Tighten if leaking or loose (para. 3-30).
glow plug
2-8


Back to Top