TM 9-2320-260-34-2
15-36. CEILING AND FRAME MAINTENANCE
THIS TASK COVERS:
a. Removal
c. Installation
b. Cleaning and Inspection
INITIAL SETUP
APPLICABLE
MODELS
MATERIALS/PARTS (Contd)
M820, M820A1, M820A2
Fibrous glass felt insulation (Appendix C, Item 16)
TOOLS
Adhesive (Appendix C, Item 2)
Primer (Appendix C, Item 31)
General mechanic’s tool kit
(Appendix B, Item 1)
REFERENCES (TM)
Rivet gun (Appendix B, Item 120)
TM 9-2320-260-10
MATERIALS/PARTS
TM 9-2320-260-34P-2
One hundred two rivets
EQUIPMENT CONDITION
(Appendix D, Item 352)
●
Parking brake set (TM 9-2320-26 0-10).
Ninety-three rivets (Appendix D, Item 357)
●
Van body sides fully expanded and secured
Six lockwashers (Appendix D, Item 219)
(TM 9-2320-260-10).
Seal (Appendix D, Item 454)
Ceiling air ducts removed (para. 15-45).
Eighty-two rivets (Appendix D, Item 346)
●
Ceiling transition removed (para. 15-42 or 15-43).
One hundred twenty-four rivets
(Appendix D, Item 354)
●
Rear doors removed (para. 15-28).
One hundred forty-four rivets
GENERAL SAFETY INSTRUCTIONS
(Appendix D, Item 359)
Gloves, eyeshields, and dust mask must be worn
Ninety-three rivets (Appendix D, Item 353)
during ceiling replacement.
Two seals (Appendix D, Item 453)
WARNING
Van body is insulated with fibrous glass felt insulation. Gloves,
eyeshields, and dust mask must be worn during ceiling replace-
ment. Failure to do so may result in injury to personnel.
NOTE
Assistant will help with steps 1 through 4.
1. Remove ninety-three rivets (4), ceiling panel (3), and two liner strips (1) from ceiling frame (2).
Discard rivets (4).
2.
Remove one hundred two rivets (5), ceiling panel (6), and two liner strips (1) from ceiling frame (2).
15-131