TM 9-2320-272-10
2-171
(22)
Remove ground spike (9) and store in storage location (14).
(23)
Remove two jack spikes (22) from foot-
pad (21) and install jack handle (19) in leveling jack (20). Rotate jack handle (19) clock-
wise until footpad (21) clears ground.
(24)
Remove leveling jack (20) from van body bracket (18) and detach footpad
(21) from jack (20).
(25)
Remove leveling jack eyebolt (23) and telescope leveling jack (20). Reinsert
eyebolt (23).
(26)
Repeat steps 23 through 25 with three remaining van body leveling jacks
(20).
(27)
Stow two leveling jacks (20), foot-
pads (21), and jack spikes (22) in compartment at rear of van body.
(28)
Stow all tools and equipment used in van operation.
(29)
Close and secure rear doors.
(30)
Install ladders (24) to rear doors (26) and secure for travel with toggle
clamps (25).
(31)
Start with van end of auxiliary power cable (28) and, using handle (29),
wind up power cable (28) on reel (27).
2-27. OPERATION OF EXPANSIBLE VAN TRUCK (Contd)