TM-9-2320-272-23-2

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 2 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-2 - Page 324 of 1417

FIELD MAINTENANCE
NG90: GOVERNOR/POWER TEST FAULT ISOLATION
INITIAL SETUP:
Personnel Required
(2)
References
TM 9-2320-272-10
TM 9-4910-571-12&P
References (cont.)
WP
0193
WP
0195
WP
0205
WP
0245
WP
0246
TROUBLESHOOTING PROCEDURE
NG90: GOVERNOR/POWER TEST FAULT ISOLATION
STEP
1.
Perform G06: Power Test.
CAUTION
Check that air inlet, is clear of tools, debris, dirt, and dust before performing test.
a.
Remove air cleaner from intake housing (WP
0246).
b.
Repeat G06: Power Test Step (2) (WP
0193).
CONDITION/INDICATION
Does engine pass power test with air cleaner out?
DECISION
YES - Replace air filter
(WP
0246). After completing repair, rerun GO-Chain tests to verify problem is fixed and
no other problems exists.
NO - Go to Step (2).
TM 9-2320-272-23-2
0204
0204-1


Back to Top