FOLLOW-ON MAINTENANCE
1.
Install oil cooler. (WP
0229)
2.
Fill cooling system to proper level. (WP
0287)
3.
Start engine and check cooling system for leaks. Tighten fittings and clamps as necessary. (TM 9-2320-272-10)
4.
Install right and left splash shields. (TM 9-2320-272-10)
5.
Install hood. (Volume 4, WP
0565)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0277
0277-6