3-150. TRANSFER CASE TO FORWARD-REAR AXLE PROPELLER SHAFT MAINTENANCE
(Contd)
d. Assembly
NOTE
Perform assembly for M927A2, M928A2, M934A2, and M935A2
models only.
1.
Install grease fitting (10) in yoke (6).
NOTE
Apply light coat of GAA grease to dust seal and splines of shaft
before installation.
2.
Install dust seal (8) on splines of shaft (9).
3.
Install shaft (7) on shaft (9).
4.
Tighten dust seal (8) on shaft (7).
e. Installation
1.
2.
3.
4.
5.
6.
7.
Install universal joint (5) on center bearing propeller shaft (4) with two bearing caps (1), new
universal plates (3), and four screws (2). Tighten screw (2) 32-40 lb-ft (43-54 N.m).
Bend tabs on universal plates (3) against screws (2).
NOTE
Perform steps 3 through 7 for M927A2, M928A2, M934A2, and
M935A2 models only.
Install bracket (19) on crossmember (18) with three screws (17), washers (20), and new
locknuts (21).
Install clamps (15) and (13) on bracket (19) and crossmember (18) with screw (16), spacer (14),
washer (121, and new locknut (11).
NOTE
Assistant will help with steps 5 through 7.
Holding forward-rear axle propeller shaft (27) on brakedrum studs (32) and forward-rear axle
flange (24), install center bearing (28) on bracket (19) with two washers (33), screws (34), and new
locknuts (29).
Install flange (31) on eight transfer case brakedrum studs (32) with new locknuts (30). Tighten
locknuts (30) 32-40 lb-ft (43-54 N.m) in alternate sequence.
Install vibration dampener (22) and flange (25) on forward-rear flange (24) with eight screws (23)
and new locknuts (26). Tighten locknuts (26) 30-40 lb-ft. (43-54 N.m).