TM-9-2320-272-24-1

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 1 OF 4

JUNE 1998

  TM-9-2320-272-24-1 - Page 812 of 1015

TM 9-2320-272-24-1
3-163. FRONT SPRING BUSHING MAINTENANCE
THIS TASK COVERS:
a. Inspection
b. Removal
c. Installation
INITIAL SETUP:
APPLICABLE MODELS
All
TOOLS
General mechanic’s tool kit (Appendix E, Item 1)
MATERIALS/PARTS
Locknut (Appendix D, Item 285)
Bushing (Appendix D, Item 22)
Pin (Appendix D, Item 514)
REFERENCES (TM)
LO 9-2320-272-12
TM 9-2320-272-10
TM 9-2320-272-24P
EQUIPMENT CONDITION
Parking brake set (TM 9-2320-272-10).
Front wheels removed (para. 3-220 or 3-221).
1.
Insert prybar between spring hanger (1) and front spring shackle (3).
2.
Press down on front spring shackle (3). If movement is evident between front spring shackle (3) and
pin (2), perform task b.
1.
Raise frame (4) to remove load from spring (12) and support with jack stands.
2.
Remove locknut (7) and screw (8) from shackle (5). Discard locknut (7).
3.
Remove grease fitting (11) from pin (10).
4.
Remove pin (10) from shackle (5) and spring eye (13). Discard pin (10).
5.
Remove spring (12) from shackle (5).
6.
Remove bushing (6) from shackle (5). Discard bushing (6).
1.
Install new bushing (6) on shackle (5).
2.
Lower frame (4) until spring eye (13) is aligned with holes in shackle (5).
3.
Install new pin (10) in shackle (5) and spring eye (13). Make sure pin slot (9) is positioned
downward to allow installation of screw (8).
4.
Install grease fitting (11) in pin (10).
5.
Install screw (8) and new locknut (7) in shackle (5).
3-448


Back to Top