TM-9-2320-272-24-1

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 1 OF 4

JUNE 1998

  TM-9-2320-272-24-1 - Page 966 of 1015

3-212. DOUBLECHECK
TM 9-2320-272-24-1
THIS TASK COVERS:
a. Removal
b. Installation
APPLICABLE
MODELS
REFERENCES (TM)
All
TM 9-2320-272-10
TOOLS
TM 9-2320-272-24P
General mechanic’s tool kit (Appendix E, Item 1)
MATERIALS/PARTS
Locknut (Appendix D, Item 299)
Antiseize tape (Appendix C, Item 72)
EQUIPMENT CONDITION
Parking brake set (TM 9-2320-272-10).
Air reservoirs drained (TM 9-2320-272-10).
GENERAL SAFETY INSTRUCTIONS
Do not disconnect air lines before draining air
reservoirs.
Do not disconnect air lines before draining air reservoirs. Small
parts under pressure may shoot out with high velocity, causing
injury to personnel.
NOTE
Doublecheck valve No. 1 is located inside the front left frame
rail and left of the front axle differential.
Tag air lines for installation.
1.
Disconnect line (1) from doublecheck valve No. 1 adapter (2).
2.
Disconnect line (12) from valve adapter (11).
3.
Disconnect line (9) from tee (10).
4.
Remove tee (10) from doublecheck valve No. (3).
5.
Disconnect line (5) from valve adapter (7).
6.
Remove locknut (8), screw (4), and doublecheck valve No. 1 (3) from frame rail (6). Discard locknut (8).
NOTE
If new doublecheck valve is being installed, use fittings from old
doublecheck valve.
Wrap all male pipe threads with antiseize tape before
installation.
1.
Position doublecheck valve No. 1 (3) against frame rail (6) and install with screw (4) and new locknut (8).
2.
Connect line (5) to valve adapter (7).
3.
Install tee (10) on doublecheck valve No. 1 (3).
4.
Connect line (9) to tee (10).
5.
Connect line (12) to valve adapter (11).
6.
Connect line (1) to doublecheck valve No. 1 adapter (2).
3-602


Back to Top