5-90. VAN
TM 9-2320-272-24-4
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP:
APPLICABLE MODEL
M934/A1/A2
REFERENCES (TM)
TM 9-2320-272-24P
TOOLS
TM 9-2320-272-24P
General mechanic’s tool kit (Appendix E, Item 1)
EQUIPMENT CONDITION
l
Parking brake set (TM 9-2320-272-10)
l
Battery ground cables disconnected (para. 3-126).
l
Ceiling filler and side panels removed (para. 5-79).
NOTE
Tag cables for installation.
1.
Remove twelve screws (4) and clamps (5) from wiring harness (6) and van ceiling (1).
2.
Disconnect plug (2) from air conditioner (3).
3.
Remove six screws (22) and cover (21) from load center (16).
4.
Remove screw (7) and clamp (8) from wiring harnesses (20) and (23) and plate (12).
5.
Remove nut (9), screw (15), two washers (10), cable assembly (14), ground cable (13), and wiring
harness cable (11) from load center (16).
6.
Remove three screws (19) and wiring harness cables (18) from 30 amp circuit breaker (17).
7.
Remove wiring harness (20) from load center (16).
1.
Position wiring harness (20) on load center (16).
2.
Install three wiring harness cables (18) on 30 amp circuit breaker (17) with three screws (19).
3.
Install wiring harness cable (11), ground cable (13), and cable assembly (14) on load center (16) with
screw (15), two washers (10), and nut (9).
4.
Install clamp (8) on wiring harnesses (23) and (20) and plate (12) with screw (7).
5.
Install cover (21) on load center (16) with six screws (22).
6.
Connect plug (2) to air conditioner (3).
7.
Install twelve clamps (5) on wiring harness (6) and van ceiling (1) with twelve screws (4).
5-570